what should do after wet concrete batching plant downtime .

2015-11-26

 

many operators will go away after they shut wet concrete batching plant,in fact, this is wrong,the following are detailed introduction of matters to which attention should be paid after downtime.
 

First of all, the staff should clean up the mixing drum, discharge door and outlet hopper, then rinse mixing drum, discharge door , outlet hopper, additives, feed system and weighing system . Second , the water is easy to freeze in winter, thus blocking pipe, The staff should drain the water of pump and water tank away at this moment. After the water of pump has drained away , you should start the pump to rotate for a while. Finally, when mixing plant is outage, material should be drained away.



Henan Better Heavy Industry Co.,Ltd is one of the largest wet concrete batching plant company in china with 20 -year experience.if you have a need for wet concrete batching plant ,you can sent email to us Thank you.

Share: