INQUIRY

Please complete the fields below and we will respond to your inquiry within 24 hours.
Tel:0086 18595613980
export@betterzg.com

News

Warm Tips for our concrete mixer

2015-07-29

 Warm Tips for our concrete mixer

1- Checking before each operation
a). if you have put the machine level and steady, if the 4 legs fixed, and if the bolt bars have been fixed tightly.
b). check the tight extent of the triangle belt, and put the operation shaft of the cutting-speed box neutral
c). If the operation without material is normal

  

2- Safe operating and cautions
a). every time when adding material, shouldn’t overpass the prescribed amount
b). for avoiding pasting the drum, the order should be: aggregate-cement- grit, or girt-cement-aggregate
c). In the course of mixing, should add water in time, for cutting the mixing time and avoiding the flying of the dust.
d). No person should be allowed to stand or pass below the material container when it’s lifted. If you must repair something bellow the 
material container, you should lift it and stop it in a certain position and pull it with safe support shaft.

e). Non-operation persons shouldn’t move the operation shaft or operate the machine.
f).  When the mixer is dragging, the material container should be lifted to the up top position, and hook the safe chain. The dragging 
speed should not overpass 20km/hour.

g). In the course of operating, the grit etc. should not drop to the operation part avoiding jamming any operating part and break it

Share: